River Corridor (RC)
Purpose:
Other info:
Impervious Surface info:
Impervious surface, maximum: 30% except that impervious coverage greater than 30% may be permitted if: (a) The increase results from a lot line adjustment between developed parcels which does not involve new development or a cumulative increase in the existing impervious coverage. (b) Justified by a design professional demonstrating that increased stormwater will be managed without adverse impacts on infrastructure or water quality. (c) The increase is required in conjunction with improvements such as: [1] Compliance with this chapter, Chapter 515,or other applicable codes of the City of Easton. [2] Compliance with the regulations of other governmental agencies. [3] Adherence to sound engineering or best management practices.